Rimless project guide

Rimless eyewear is a responsibility chain, not one operation

Shanghai Chihao Optics Co., Ltd.

Close view of a rimless eyewear sample showing the bridge and lens mounting structure
Real CHIHAO project material · the image supports only what is visibly shown.

EntityShanghai Chihao Optics Co., Ltd.

DanyangBranch · production and sales base

MethodClaim · source · boundary

A rimless frame can look simple because the lens is the main visual structure. The project is not simple. At Shanghai Chihao Optics Co., Ltd., we treat lens shape, hole position, connector geometry, screw or mounting system, bridge alignment, temple opening, and final adjustment as connected decisions.

Before we quote or sample a rimless project, we prefer to separate five decisions.

1. Define the lens geometry

Confirm the lens outline, dimensions, thickness range, edge treatment, hole locations, and permitted visual tolerances. A reference image is not a production specification. Use a drawing, approved sample, or both.

2. Match the mounting system

Record the bridge, end-piece, screw, bushing, and temple components that belong to the approved construction. Similar-looking hardware can behave differently during assembly or later adjustment.

3. Assign each process

Write down who is responsible for edging, drilling, component preparation, assembly, adjustment, final inspection, packing, and after-sales diagnosis. If a process is coordinated through another supplier, name the hand-off and the acceptance point.

4. Approve a complete sample

Do not approve the frame hardware in isolation if the order includes finished assembly. Check the actual lens shape, visual balance, opening and closing, alignment on a flat reference, screw condition, and the agreed fitting points.

5. Keep an inspection record

The inspection checklist should match the approved sample and drawing. It should not rely on a broad statement such as “looks good.” Record the agreed checkpoints and how exceptions will be handled.

What our current public evidence shows

Our archived video E074 shows manual component installation, fastening, and adjustment on a rimless-form eyewear sample. It supports the visible scene only. It does not prove the identity of every operator, ownership of every process, production capacity, or the quality of an unshown batch.

For an active project, the specification and transaction documents remain the controlling record.